Management Systems for Transport in the Identify Stage

Objective

  • Identify the potential management systems for the transport element of the CCS project
  • Give adequate consideration to both the interface with the capture plant and the proposed storage facility (Saline Aquifer or Semi-Depleted oil/gas field) 

Major Deliverables

  • Identification of management requirements for CO2 transport system including operational responsibility for:
    • CO2transportation selection
      • Pipeline routes
      • Development of CO2 hub with storage and shipping options
      • Operational and Maintenance Practices
        • Including initial start up
        • Ramp up operational requirements
        • Full operational capacity operating practices
        • Potential line packing requirements
        • Offshore installation requirements
      • Subsea surveys
        • Specialised offshore trenching
        • Pipeline integrity review – NDT requirements
        • Material science corrosion review
        • Major interface connections to onshore compressor unit and injection facility
        • Financial management of operational commercial arrangements regarding transport system usage
  • Identification of project steering committee and functional lines of communication including a RACI structure for project delivery

Tasks

  • Development of appropriate project management structure for major pipeline design and development works
  • Identification of key specialist sub-contract teams required to support development of pipeline management team
  • Development of appropriate project management quality system and document control procedures
  • Development of timeline for major review of implementation systems for management practices
  • Development of financial management system for transportation usage going forwards

Examples

Key Personnel

  • Project Manager
  • Pipeline Engineering Manager
  • Key Engineering Sub-Contractors
  • Commercial Manager