Identify the potential management systems for the transport element of the CCS project
Give adequate consideration to both the interface with the capture plant and the proposed storage facility (Saline Aquifer or Semi-Depleted oil/gas field)
Major Deliverables
Identification of management requirements for CO2 transport system including operational responsibility for:
CO2transportation selection
Pipeline routes
Development of CO2 hub with storage and shipping options
Operational and Maintenance Practices
Including initial start up
Ramp up operational requirements
Full operational capacity operating practices
Potential line packing requirements
Offshore installation requirements
Subsea surveys
Specialised offshore trenching
Pipeline integrity review – NDT requirements
Material science corrosion review
Major interface connections to onshore compressor unit and injection facility
Financial management of operational commercial arrangements regarding transport system usage
Identification of project steering committee and functional lines of communication including a RACI structure for project delivery
Tasks
Development of appropriate project management structure for major pipeline design and development works
Identification of key specialist sub-contract teams required to support development of pipeline management team
Development of appropriate project management quality system and document control procedures
Development of timeline for major review of implementation systems for management practices
Development of financial management system for transportation usage going forwards