CCS integration report: American Electric Power. Mountaineer CCS II Project: phase 1

24th October 2011

Topic(s): Carbon capture use and storage (CCUS)

This report explains the level of integration and various interface points between American Electric Power’s Mountaineer generating station and the proposed nominal 235 MWe commercial-scale application of Alstom’s Chilled Ammonia Process (CAP) for CO2 capture. The report provides an overview of the existing systems throughout the plant required to support the operation of the Carbon Capture and Sequestration (CCS) system, and presents how AEP considered and evaluated the integration of these systems during the Front End Engineering and Design (FEED) effort.

Download

Back to Publications

Disclaimer

The content within the Global CCS Institute Publications, Reports and Research Library is provided for information purposes only. We make every effort and take reasonable care to keep the content of this section up-to-date and error-free. However, we make no claim as to its accuracy, currency or reliability.

Content and material featured within this section of our website includes reports and research published by third parties. The content and material may include opinions and recommendations of third parties that do not reflect those held by the Global CCS Institute.

CCS integration report: American Electric Power. Mountaineer CCS II Project: phase 1

Newsletter

Get the latest CCS updates