A diverse group of organisations from industry, government, and the environmental community jointly sponsored Industrial Economics (IEc), an expert in environmental economics and natural resource damage assessment, to develop and test a model approach for valuing the economic damages arising from a well-sited and well-managed CCS project. These damages included environmental and human health impacts arising from a range of potential events such as pipeline ruptures and subsurface leakage. They do not address potential impacts from facility construction or routine operation, nor do they address potential impacts to workers, business interruption, facility repair or similar ‘private’ costs internal to the operator. The model was successfully developed and applied to a ‘realistic’ project based on the publicly available risk assessment for a site from the FutureGen 1.0 site selection process. The project was planned to inject 50 million metric tons of CO2 over 50 years and to have a 50 year post-injection period (for a 100-year analysis period).

This site-specific application of the model showed that the ‘most likely’ (50th percentile) estimated damages arising from CO2 totalled approximately $7.3 million and ‘upper end’ (95th percentile) estimated damages totalled approximately $16.9 million. On a per metric ton basis, these results translate into ‘most likely’ (50th percentile) estimated damages of $0.15 per metric ton and ‘upper end’ (95th percentile) estimated damages of $0.34 per metric ton. When combined, the estimated damages for CO2 and H2S were roughly 10-15 per cent higher.

It is important to note that the range of damage estimates is highly sensitive to site-specific data. The sponsor group concludes that the tools exist to estimate prospective financial damages. Further, the sponsor group has developed insight into the magnitude and timing of dollar amounts that are likely to be at risk and the conditions under which they may be at risk at a well-selected and well-managed CCS project. This analytic approach is based on generally accepted practices within the financial and insurance industries, and can be applied, with adjustment for location, to CCS projects around the world.

Download

Back to Publications

Disclaimer

The content within the Global CCS Institute Publications, Reports and Research Library is provided for information purposes only. We make every effort and take reasonable care to keep the content of this section up-to-date and error-free. However, we make no claim as to its accuracy, currency or reliability.

Content and material featured within this section of our website includes reports and research published by third parties. The content and material may include opinions and recommendations of third parties that do not reflect those held by the Global CCS Institute.

Valuation of potential risks arising from a model, commercial-scale CCS project site

Newsletter

Get the latest CCS updates