Zero Emission Porto Tolle: ZEPT Project results

This report summarises the main lessons learnt and key findings from the Zero Emission Porto Tolle (ZEPT) project. The ZEPT project was funded by the European Energy Programme for Recovery (EEPR) during the period 2009-2013 and covered the design, procurement and construction of a demonstration CCS plant as well as the detailed site characterisation, to verify the feasibility of the injection and storage of CO2 in a safe and verifiable manner.

Filter by

[ Clear Filtering ]

Understanding industrial CCS hubs and clusters
Understanding industrial CCS hubs and clusters

28th June 2016

Organisation(s): Global CCS Institute

Topic(s): Hubs and Clusters, Industrial CCS

The technology components of carbon capture and storage (CCS) are already proven and in use across a variety of industries and applications.

In some instances, individual industrial facilities can capture millions of tonnes of carbon dioxide (CO2) each year. However, many industrial plants operate at much smaller scales, and as a result have lower overall emissions. While the combined level of emissions from a number of such smaller scale facilities can be significant, it may be uneconomic for any individual facility to consider application of the full CCS chain which includes capture, compression, transport and permanent storage of CO2.

One solution to this problem is clustering, in which several industrial facilities share CCS infrastructure and knowledge, and thus reduce their costs compared with each facility attempting to individually reduce emissions. This report provides an overview of the idea of clustering as applied to industrial CCS projects, and examines the conditions needed for its more widespread adoption.